Estimate the cost range for an injection mold based on part size, material, cavities, surface finish, and expected tool life.
Mold Specifications
Estimated Mold Cost
Low Estimate
$6,000
High Estimate
$15,000
Estimated mold cost: $6,000 – $15,000 for a medium (e.g. enclosure panel, bracket) part with 2 cavities, abs (general-purpose), basic / as-machined finish, and standard (~500k–1m shots) tool life.
Example
A medium-sized ABS enclosure panel, 2-cavity mold, basic finish, standard tool life:
Estimated cost: $6,000 – $15,000
How to Use This Tool
Enter your inputs in the fields above.
The tool calculates results automatically — no submit button needed.
Review the results below. All estimates are approximate and for planning purposes only.
Use the copy or print buttons to save your results, if available.
Disclaimer: This tool provides estimates for planning purposes only. Actual costs, timelines, and outcomes depend on factory capability, order quantity, material market conditions, design complexity, and many other factors. Always confirm with written supplier quotations before making purchasing or investment decisions.
Frequently Asked Questions
How accurate are these mold cost estimates?
These are planning estimates based on typical China mold market ranges. Actual costs vary by factory location, mold maker experience, steel grade, and current material prices. Always get written quotations from at least 3 mold makers.
What is included in the mold cost?
The estimate covers the mold base, cavity/core machining, ejection system, and cooling channels. It typically does not include hot runner systems, side actions, or part design changes requested after mold design approval.
How long does mold making take?
Typical lead time is 3–6 weeks for standard molds (non-hardened), 5–10 weeks for hardened production molds. Complex multi-cavity or high-polish molds may take longer.
Should I choose prototype or production tooling?
Prototype tooling (aluminum or soft steel) is 40–50% cheaper and faster but lasts only 10k–50k shots. Production tooling (hardened steel) costs more upfront but lasts 500k+ shots. Choose based on your expected lifetime volume.
Who owns the mold?
You should own the mold. This should be clearly stated in your contract. If you ever switch factories, you can take the mold with you. Never pay for a mold without clearly defining ownership terms.